The ENERGO-PRO Group was established in 1994 in the Czech Republic. Its core business is the hydropower sector. The Group operates hydropower plants in Central and Eastern Europe, the Black Sea and the Caucasus. It has expanded from the middle of Europe to Bulgaria, Georgia and Turkey. Currently, the Group operates 36 hydropower plants in 4 countries, produces and distributes electricity to almost 2.5 million customers, and has more than 10.000 employees.

The mission of ENERGO-PRO is to work in compliance with nature. ENERGO-PRO sticks to these values – Efficiency, Reliability, Responsibility, Compliance, Tolerance, Expertise and Safety, and works in accordance with these values in all countries where it operates.

The total capacity of the ENERGO-PRO’s power plants is 863 MW, the annual electricity production is over 3 TWh.

Part of the multinational ENERGO-PRO Group is also the Slovenian producer of water turbines – Litostroj Power, which has significant projects in Canada, Egypt and Iceland, and the Czech company Litostroj Engineering focusing on research, design and engineering works. In this respect, the company follows the industrial tradition of Central Europe.

Countries

Czech Republic

Bulgaria

Georgia

Turkey

Entered Market

1994

2000

2006

2010

Presence

2 HPPs

14 HPPs

DisCos

15 HPPs

1 TPP

2 DisCos

5 HPPs

Employees

70

2500

6180

145

Capacity (MW)

10

166

592

95

Generation (GWh)

45

456

1820

580 GWh

Customers

-

Over 1 200 000

Over 1 000 000

1200

Development Plans

-

-

1 trans.line under development

2 HPP’s under construction